Author supervision within the TBiARCHITEKCI team.
Creation of a BIM model for the consortium general contractor TBINVEST (coordination of installation subcontractors, guidelines and 3D models for concrete and timber prefabrication, quantitative verification on the model).
The entire facility comprises a total of three buildings including: two teaching buildings and a gymnasium building. In addition to a school for more than 800 pupils, the centre also includes a kindergarten for 250 children.
As part of the investment, sports infrastructure will also be created in the area around the school, including: a football pitch; a multi-functional pitch (for basketball, volleyball, tennis); a running track; a long jump and a playground for the school’s youngest pupils.
The gymnasium building is constructed using traditional reinforced concrete and brick technology with a glulam roof. Both teaching buildings are prefabricated concrete base, 2 floors above in prefabricated timber.
Centre under construction.
ADRESS: ul. Jabłoniowa, Gdańsk
USABLE AREA: 3 BUILDINGS AND 13 250 M2